Building, civil works, refurbishment and industrial construction. We coordinate trades, permits and deadlines, so all you have to do is collect the keys.

Aerial view of Barcelona’s Eixample with the Sagrada Família at its centre
Sheet 01 · Cerdà’s Eixample, BarcelonaScale 1:5,000

±0,00Ground floor · Who we are

We are IGI, a construction company from Barcelona. For eleven years we have been building, refurbishing and handing over projects: inside the Sagrada Família, at Terminal E of the Port, in schools. Our turnover is 20 million euros, and we are aiming for 25.

+3,40Floor 1 · Specialities

Four specialities. One team in charge.

One point of contact from the first study to handover. We coordinate trades, permits and deadlines, and take responsibility for the whole job.

  • New build and refurbishment of buildings. We manage the site, coordinate every trade and handle the permits.

    New build · Site management · Trades · Permits

    Tower cranes in silhouette
    See building projects

+6,80Floor 2 · Featured project

We have worked inside the Sagrada Família.

Three trades on a single project: we painted the entire interior, installed flooring and carried out electrical work, with coordination and technical supervision from start to finish.

Painting
Entire interior
Flooring
Installation
Electrical
Installation
Coordination
Technical supervision

+13,60Floor 4 · Method

How a project is run.

A typical twelve-week refurbishment schedule. Every project has its own; the order never changes.

  1. Analysis

    Weeks 1 to 2

    We visit, measure and read the whole project. Whatever is missing is found here, while it still costs nothing.

  2. Planning

    Weeks 2 to 4

    Budget by line item, schedule, trades and permits. A plan that can be kept, signed before we start.

  3. Execution

    Weeks 5 to 11

    Daily site management, quality and safety control. Every working day is logged in Obrelier.

  4. Handover

    Weeks 11 to 12

    Snagging, final documentation and keys. And we still answer the phone after handover.

+17,00Floor 5 · Site control

Your project, verified in real time.

We run our sites with Obrelier. Every clock-in is verified on site, the office sees who is in and how far the work has progressed, and if someone needs help we know straight away. If you wish, you can see it too.

  • Clock-ins verified on site
  • Who is on site, at any moment
  • Evacuation roll call in one tap
  • End-of-day report, by voice too

Illustrative screens with sample data.

+20,40Roof · Contact

Got a project on your hands?

Tell us what it is, where it is and when you need it. We will reply with a first assessment and the next steps.